  • 10MB? This proof is 70 GB.

    It requires 100 GB of ram to even run the compiler.

    Now, I do respect the determinstic nature of computers always being right, but with 70 GB of potential integer overflows and rounding errors made by a hallucinating slop generator, I would appreciate if someone actually understood the point of it well enough to give a more brief explanation or at least confirm that each and every bit of that 70GB returns the correct value.

  • They have solar and are connected to the grid. The sun doesn’t shine at night so it’s a bit back and forth. The production is not the issue. It’s the grid capacity being maxed out that is causing the grid provider to halt all other businesses from joining. These businesses would like to go electrical instead of using fossils, but they can’t because of this massive datacenter utilizing the entire capacity.

  • There’s an Apple data center near me. They use renewable power and even feeds the surplus heat back to the district heating system, and also the area is a green field with native vegetation.

    Anyway, its still a problem.

    They’re using all the capacity of the grid so that other production companies can not connect and transition to green power. It’s not that we don’t have enough green electricity, it’s just not possible to distribute it to where it’s needed, because there’s this huge data center hogging up all the power to produce AI cat pictures or some bullshit that nobody asked for.

    It should never have been approved. The municipality got tricked into it with promises of hundreds of jobs, but ended up with a net loss of jobs from the production companies having to move elsewhere with their jobs and revenue.