I noticed a few years ago that in my state, almost all the existing substations began to have walls built around them, and new construction has both walls and buffer zones so the equipment isn’t just next to a fence/wall. This was even before all the incidents of people attacking substations.
The messed up thing that can happen is other failure modes - EV chargers can be hacked en masse to destabilize the grid (or by backfeeding power to the grid from EV batteries. I can’t find a source right now but I’ve seen an article that said about 200 EV’s connected to hacked chargers could fry every substation in NYC), or that specific power cables that lack redundant pathways and can be severed faster than power generation can be drawn down, causing cascading failures and ultimately, a full stop and black start of the affected area - assuming no transformers were taken out.
The U.S. has a limited supply and low capacity to produce substation-scale transformers. If a substantial number of transformers get damaged, it could be lights out for 6 months to a year for some places. (Although the ability to buy solar panels or wind turbines may help ease that substantially - the time estimate is just about repairing the existing infrastructure.)
So this is how you get corporate-owned media to start openly discussing Trump’s dementia.